home *** CD-ROM | disk | FTP | other *** search
/ Ron Blank & Associates 7 / Ron Blank & Associates 7.iso / big03a / big03a53.png < prev    next >
Portable Network Graphic  |  2003-07-24  |  25KB  |  700x525  |  8-bit (125 colors)
Labels: hakham | monitor | plant | stairs | web site | window
OCR: Pre-molded bell footings Overview Testing pre-molded bell footings History of footings Horizontal testing: Conducted PSC Analytical Services Development of ithe Mechanical Testino Services Group Bell Footing Testing: Pre-molded bell The concrete was allowed to set up for at least one week prior to footings load testing horizontal load was applied was applied t0 each Review System measured using usind portable 50 kip hvdraulic load ram, cell and see Fioure movement The was load was References measured using displacement transducer both were recorded TEST using digital data acquisition svstem Results The results of the test are detailed in Table on next slide The values reported are for the maximum load The Systems withstood and the total amount displacement that occurred Do to the nature of ...